Metro train moves on Western Ahmedabad tracks for the first time in pre-trial run
February 19, 2022
Sabarmati: A metro train rolled on the tracks of the western part of Ahmedabad city for the first time during the pre-trial run conducted on Friday night on about 2 km long stretch between the Gyaspur depot and Jivraj park stations. Such pre-trial runs are planned on the entire track of Phase – 1 portion of the project in Ahmedabad city in August by Gujarat Metro Rail Corporation. The Research Design and Standards Organisation (RDSO) Lucknow will conduct trials after pre-trial.
The safety trials will be conducted after the RDSO certifies the track after which the free runs will be started. The authorities aim to have both east-west and north-south corridors ready by April 2022, informed the officials.
The Gyaspur-Jivraj Park stretch is about 2 km long and has 2 stations namely APMC Vasna station and Jivraj Park station, informed the officials. The Gyaspur-Jivraj Park stretch that connects APMS Vasna and Jivraj Park stations is a part of the 18.87 km north-south corridor from APMC Vasna to Motera.
Related Stories
In video: Metro train Blue line route trial run on Drive-In Road
First phase of Ahmedabad Metro train likely to be functional in August 2022
Recent Stories
- RIL reports Rs 21,243-crore profit for Q4 FY2023-24; EBITDA up 16.1%
- AIMIM to not contest in Lok Sabha elections from Gujarat
- 35 including 10 minors take Deeksha in Ahmedabad embracing monkhood
- Firing at Salman's House: Mumbai Crime Branch searches for gun in Surat's Tapi River
- Vehicles with White LED Headlights to face action; Ahmedabad RTO begins drive
- Surat Lok Sabha seat BJP candidate wins unopposed
- BJP leaders in talks with Kshatriya community members